65 Wynford Heights Cr. Apt # 2202
Don Mills, ON. M3C 1L7 (416) 391-5404 /TORONTO
t.yuksel@usa.net http://eskiadam.tripod.com/t-yuksel
¨
Maintained various kinds of
machinery at a big textile factory including the HVAC systems and air
compressors.
¨
Extensive knowledge of
Predictive, Preventive and Periodic maintenance procedures.
¨
Participated in fabrication,
sand blasting, painting, and erection of steel structures, tanks, cyclones, and
conveyors.
¨
Insulation of piping, steam
traced piping, ducts, boilers and equipment. Noise insulation of big flue gas
fan bodies.
¨
Took part in automatic
control systems, pneumatics and hydraulics. Modernization of machinery by using
pneumatic control systems, PLC and microprocessors.
¨
Design of machinery, air
conditioning, humidifying systems and heat recycles system from hot liquid
waste. Creative ability on design of new machines or apparatuses.
¨
Turn key erection of
corrugated grain silos, maize drying and storage system.
¨
Manufacturing of spare parts
for machinery. Knowledge of galvanized sheet metal fabrication.
¨
Experienced in steel and
stainless steel piping and fabrication of some stainless steel tanks.
¨
Computer;
Windows and MS Office applications. Knowledge of AutoCAD-14 software.
Some programming skills in FORTRAN IV and BASIC computer languages. Multimedia
applications on PC. (Amateur film production, audio or photo CD.) Capable of
assembling the computer hardware, installing the operating system. Preventing
and solving the hardware conflicting problems.
¨
Managerial ; A self-motivated professional. Strong leadership, team building and
problem solving expertise. Team Work, Time Management, Analytical Thinking.
Project management.
¨
Capability on woodworking
like a cabinetmaker.
Maintenance of all machinery, air conditioning systems and compressors
in a big textile factory. Preparation of periodic maintenance schedules.
Preparation of written documents for every kind of periodic maintenance program
and keeping all maintenance records. Supplying of all spare parts for the
machinery, and manufacturing of some of them, or preparing the drawings for
them to be manufactured. Quality control of the all supplied spare parts.
Installation and commissioning facilities for new air conditioning and waste
collection systems supplied by LUWA
AG / Switzerland and AMELIORAIR
/ France with the supervisors of suppliers. Installation and
commissioning of some kind of machinery (the Mach coner machines by MURATA / Japan, twisting
machines by VOLKMANN / Germany,
warping machine by BENNINGER /
Switzerland ) with the supplier supervisors. Managing all maintenance
team (total 65 persons) to reduce the unexpected stop of a machinery and loss
of production.
August, 1988 – April, 1989: As a subcontractor for Emel Insaat A.S. company. / MERSIN
Maintenance, fabrication and
erection of steel structures, piping works as a subcontractor.
Turn key erection of grain
silos and storage systems with supervisors of GSI / USA and ITALIMPIANTI
/ Italy. Managing of whole project and completion of it.
Insulation works of the lube
oil complex (IRAQ) with the main contractor TPL / Italy. Managing the insulation team (60
persons). Preparing the program for sheet metal fabrication, insulation and
erection.
Production, sand blasting,
painting and erection of steel structures, silos, tanks, conveyors, vibrating
feeders for a new Ferro-chrome plant with the members of consortium ELKEM AS / Norway and OTOKUMPU OY / Finland. Planning
of the supply of the required material according to the work flow chart.
Responsibility for the production works of the steel workshop. Managing the own
production, erection team (40 persons) and the subcontractors. Preparation of
shop drawings according to the standard steel plates, for the steel workshop
production.
Rank : Sergeant.
September,
1983 – July, 1984: Field Chief -
İZİMTAŞ. / İSTANBUL
all insulation works of Afsin Thermal Power Plant with the main
contractor FWIC / USA.
Managing the all insulation team (130 persons). Preparation of the work
schedule. Preparation of “Offer Letters” to FOSTER WHEELER company, for some additional jobs defined by them.
1983 :BSc, Mechanical Engineering.
Middle East Technical
University. ( Eligible for P. Eng. )
/ TURKEY
PROFESSIONAL TRAINING
|
February 16,1994 |
: Bearing Industry |
: Fag /
Endas Training Group |
|
June 22, 1995 |
: Bearing Industry |
: ORS
Factory Training Group |
|
November 21-24, 1995 |
: Bearing Maintenance Techniques |
: SKF
Turk Training Group |
|
September 11, 1996 |
: ISO 9000 & Calibration |
: S&Q
Mart Consultant |
|
March 06-08, 1997 |
: Organizational Communication |
: Sabanci
Holding H.R. |
|
May 23-24, 1997 |
: Statistical Process Control |
: Lider Management |
|
June 13-15, 1997 |
: Auditor For ISO 9001 |
: Lider
Management |
|
March 06-07, 1998 |
: Active Communication |
: Sabanci
Holding H.R. |
|
April 12-13, 1999 |
: Economy Of Turkey |
: Sabanci
Holding H.R. |
|
June-August, 1999 |
: Auto Cad R-14 (45 hours) |
: EBOS
Computer |
HOBBIES: Carpentry, Playing music, Computer hardware and
repairs, Listening to music, Theatre, Table tennis. Fishing.
REFERENCES: Available upon request.