Tacettin YUKSEL ( Taci )

65 Wynford  Heights  Cr. Apt # 2202

Don Mills, ON. M3C 1L7  (416) 391-5404  /TORONTO

t.yuksel@usa.net        http://eskiadam.tripod.com/t-yuksel

_____________________________________________________________________________

 

OBJECTIVE
To obtain a position related to my profession that utilizes my managerial and technical experience in my diverse background.

 

TECHNICAL PROFILE & SKILLS

¨      Maintained various kinds of machinery at a big textile factory including the HVAC systems and air compressors.

¨      Extensive knowledge of Predictive, Preventive and Periodic maintenance procedures.

¨      Participated in fabrication, sand blasting, painting, and erection of steel structures, tanks, cyclones, and conveyors.

¨      Insulation of piping, steam traced piping, ducts, boilers and equipment. Noise insulation of big flue gas fan bodies.

¨      Took part in automatic control systems, pneumatics and hydraulics. Modernization of machinery by using pneumatic control systems, PLC and microprocessors.

¨      Design of machinery, air conditioning, humidifying systems and heat recycles system from hot liquid waste. Creative ability on design of new machines or apparatuses.

¨      Turn key erection of corrugated grain silos, maize drying and storage system.

¨      Manufacturing of spare parts for machinery. Knowledge of galvanized sheet metal fabrication.

¨      Experienced in steel and stainless steel piping and fabrication of some stainless steel tanks.

¨      Computer; Windows and MS Office applications. Knowledge of AutoCAD-14 software. Some programming skills in FORTRAN IV and BASIC computer languages. Multimedia applications on PC. (Amateur film production, audio or photo CD.) Capable of assembling the computer hardware, installing the operating system. Preventing and solving the hardware conflicting problems.

¨      Managerial ; A self-motivated professional. Strong leadership, team building and problem solving expertise. Team Work, Time Management, Analytical Thinking. Project management.

¨      Capability on woodworking like a cabinetmaker.

 

PROFESSIONAL EXPERIENCE

May, 1989 – September, 2000: Maintenance Chief - BOSSA TAŞ.    / ADANA

Maintenance of all machinery, air conditioning systems and compressors in a big textile factory. Preparation of periodic maintenance schedules. Preparation of written documents for every kind of periodic maintenance program and keeping all maintenance records. Supplying of all spare parts for the machinery, and manufacturing of some of them, or preparing the drawings for them to be manufactured. Quality control of the all supplied spare parts. Installation and commissioning facilities for new air conditioning and waste collection systems supplied by LUWA AG / Switzerland and AMELIORAIR / France with the supervisors of suppliers. Installation and commissioning of some kind of machinery (the Mach coner machines by MURATA / Japan, twisting machines by VOLKMANN / Germany, warping machine by BENNINGER / Switzerland ) with the supplier supervisors. Managing all maintenance team (total 65 persons) to reduce the unexpected stop of a machinery and loss of production.

 

August, 1988 – April, 1989: As a subcontractor for Emel Insaat A.S. company. / MERSIN

Maintenance, fabrication and erection of steel structures, piping works as a subcontractor.

 

September, 1987 – July, 1988: Mechanical erection chief -BAŞAR MAKİNA AŞ./ İSTANBUL

Turn key erection of grain silos and storage systems with supervisors of GSI / USA and ITALIMPIANTI / Italy. Managing of whole project and completion of it.

 

November, 1986 – August, 1987: Field Engineer - ALARKO AŞ. (SAN-SAL) / İSTANBUL

Insulation works of the lube oil complex (IRAQ) with the main contractor TPL / Italy. Managing the insulation team (60 persons). Preparing the program for sheet metal fabrication, insulation and erection.

 

May, 1985 – October, 1986: Site Engineer - ALARKO AŞ.  / İSTANBUL

Production, sand blasting, painting and erection of steel structures, silos, tanks, conveyors, vibrating feeders for a new Ferro-chrome plant with the members of consortium ELKEM AS / Norway and OTOKUMPU OY / Finland. Planning of the supply of the required material according to the work flow chart. Responsibility for the production works of the steel workshop. Managing the own production, erection team (40 persons) and the subcontractors. Preparation of shop drawings according to the standard steel plates, for the steel workshop production.

 

August, 1984 – April, 1985:  Military Duty / BALIKESİR

Rank   : Sergeant.

 

September, 1983 – July, 1984: Field Chief - İZİMTAŞ.  / İSTANBUL

all insulation works of Afsin Thermal Power Plant with the main contractor FWIC / USA. Managing the all insulation team (130 persons). Preparation of the work schedule. Preparation of “Offer Letters” to FOSTER WHEELER company, for some additional jobs defined by them.

 

EDUCATION

1983               :BSc, Mechanical Engineering.

 Middle East Technical University. ( Eligible for P. Eng. )        / TURKEY

 

PROFESSIONAL TRAINING

February 16,1994

: Bearing Industry

: Fag / Endas Training Group

June 22, 1995

: Bearing Industry            

: ORS Factory Training Group

November 21-24, 1995

: Bearing Maintenance Techniques

: SKF Turk Training Group

September 11, 1996

: ISO 9000 & Calibration 

: S&Q Mart Consultant

March 06-08, 1997

: Organizational Communication

: Sabanci Holding H.R.

May 23-24, 1997    

: Statistical Process Control     

: Lider Management

June 13-15, 1997   

: Auditor For ISO 9001

: Lider Management

March 06-07, 1998

: Active Communication 

: Sabanci Holding H.R.

April 12-13, 1999

: Economy Of Turkey

: Sabanci Holding H.R.

June-August, 1999

: Auto Cad R-14 (45 hours)

: EBOS Computer

 

PROFESSIONAL SOCIETIES: Chamber of Mechanical Engineers, TURKEY

 

HOBBIES: Carpentry, Playing music, Computer hardware and repairs, Listening to music, Theatre, Table tennis. Fishing.

 

REFERENCES: Available upon request.